Bard Ventures Update


Bard Ventures is pleased to provide this update of activities and an outline of planned exploration in 2009 on the Lone Pine Property, British Columbia. In 2008, an extensive diamond drilling program consisting of 41 holes for a total of 21,557 meters resulted in delineation of a 43-101 compliant resource within the Alaskite Zone (tabulated below). At a 0.04% Mo cut-off there is a measured and indicated resource of 110,340,000 tonnes grading 0.083% Mo containing approximately 200 million pounds of molybdenum. The delineation of this resource and the related geological and technical information has provided an impressive model that is now being used by the Company’s technical staff to direct future exploration. Bard has recently completed, based on the model of the Alaskite Zone, a complete review and analysis of the 3D inversion induced polarization and magnetic geophysical surveys and the geological mapping and prospecting based on the model that is now available for the Alaskite Zone. This interpretation has identified new target areas within the Property that show the potential for the discovery of an entirely new zone of mineralization similar to the Alaskite Zone that, in certain cases, may be at or near surface.

Exploration in 2009 will initially focus on geological mapping, prospecting and additional detailed geophysical surveys that will evaluate these new target areas to define specific targets for diamond drilling. The goal of the 2009 exploration program will be to discover new areas of mineralization and to focus on targets that indicate the potential for the discovery of mineralization at or near surface. If successful, this will result in an expansion of the current resource and the delineation of near surface mineralization that could serve as the source of initial development within the Lone Pine Property.

The 2009 program has been designed giving due consideration to the current economic conditions and commodity prices. It will serve to continue to enhance and increase the potential of the Lone Pine Property and to build upon the success that the Company has had in the recent past.

Lone Pine measured, indicated and inferred mineral resource summary:

  MEASURED
Cut-off %
Mo
Tonnes >
Cutoff
(000’s)
Mo% in-situ lbs
Mo
(000’s)
0.02 43,767 0.078 75,262
0.03 40,450 0.082 73,125
0.04 33,356 0.092 67,654
0.05 26,676 0.104 61,163
0.06 22,486 0.113 56,018
0.07 19,625 0.120 51,919
0.08 17,699 0.125 48,775
0.09 15,853 0.130 45,435
0.10 13,922 0.135 41,435
 
INDICATED
Tonnes >
Cutoff
(000’s)
Mo% in-situ lbs Mo
(000’s)
107,769 0.066 156,809
99,967 0.069 152,069
76,984 0.079 134,079
58,193 0.090 115,464
43,968 0.102 98,871
35,077 0.111 85,839
29,884 0.117 77,084
25,703 0.123 69,698
21,053 0.129 59,875
     
  MEASURED+INDICATED
Cut-off %
Mo
Tonnes >
Cutoff
(000’s)
Mo% in-situ lbs
Mo
(000’s)
0.02 151,536 0.069 232,071
0.03 140,417 0.073 225,193
0.04 110,340 0.083 201,733
0.05 84,869 0.094 176,628
0.06 66,454 0.106 154,890
0.07 54,702 0.114 137,758
0.08 47,583 0.120 125,858
0.09 41,556 0.126 115,132
0.10 34,975 0.131 101,310
 
INFERRED
Tonnes >
Cutoff
(000’s)
Mo% in-situ lbs Mo
(000’s)
27,827 0.084 51,532
27,555 0.085 51,636
25,840 0.088 50,131
22,839 0.094 47,331
18,295 0.104 41,947
15,238 0.111 37,290
13,092 0.117 33,769
11,800 0.121 31,477
10,186 0.125 28,070
*Note: Bold indicates Base Case Scenario.

A full text version of the Lone Pine Property resource estimate was filed on SEDAR and is available at www.sedar.com under the Company’s profile and can also be found by visiting the Company’s website at www.bardventures.com. The report, dated January 12, 2009, entitled “Resource Estimate Lone Pine Molybdenum Project – Omineca Mining Division, British Columbia”, was prepared by Ronald G. Simpson, P.Geo. of GeoSim Services Inc., a “qualified person” for the purposes of National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

The Property has an ideal location for operations with established infrastructure including:

  • Highway 16;
  • a natural gas pipeline;
  • a major hydro power transmission line and transformer sub-station; and
  • is located only 15 kilometers from the CN rail line in Houston, BC.

A plan of the drill holes in the Alaskite Zone may be viewed on the Company’s website at www.bardventures.com.

Bard is earning a 100% interest in the Property under the terms of an option agreement (see News Release dated September 15, 2006). The Lone Pine exploration work is being conducted under the supervision of Qualified Person Jim Miller-Tait, P.Geo., a Director of Bard.

Share and Enjoy:
  • Print this article!
  • Digg
  • del.icio.us
  • Mixx
  • Google Bookmarks
  • StumbleUpon
  • Twitter
  • Facebook
  • LinkedIn
  • E-mail this story to a friend!

,

  1. No comments yet.
(will not be published)

  1. No trackbacks yet.

 Powered by Max Banner Ads